This case study discusses how a company operating data centers worldwide successfully overcame challenges in scaling up to 100G. The client was experiencing challenges in testing 100G over its intradata center links and data center interconnects (DCI). With far more complex infrastructures, our client was faced with costly network outages and component failures.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.