en
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z 0-9

To add favorites to a list, you must be logged in to your account.

Login Register

CPRI Protocol Testing–Confirm Correct RRH Installation and Eliminate Re-Climbs

  • May 4, 2016

Diong Ming Cheng

Application Engineer, EXFO

Diong Ming Cheng is Application Engineer for EXFO APAC Singapore Ltd, a Leading Test & Measurement provider headquarter in Canada, Quebec.In this role, Diong is responsible to present EXFO solution of Transport & Datacom range of products in the T&M Pre-Sales activities particularly in the ANZ and SEA.Over the past 5 years, Diong has been actively engaging and educating service providers in the field to adopt best practice and solutions in the Optical transport, Ethernet transport, MPLS/IP Networks and also next generation transport network.

This webinar series covers everything you need to know to efficiently qualify fiber-to-the-antenna (FTTA) networks and confirm that remote radio heads (RRH) and CPRI links are fully functional before leaving the cell site – in just one field trip.

Webinar Series on Fronthaul Testing

The path towards complete FTTA/RRH site turn-up - in just one field trip.

Part 3: CPRI Protocol Testing–Confirm Correct RRH Installation and Eliminate Re-Climbs

CPRI basics and common issues faced in the field. What is the importance of CPRI link validation before turn-up? What are the best industry practices to validate RRH installation?

  1. Recap of previous sessions
  2. CPRI basics
  3. Challenges and common issues in the field (RRH, SFPs, etc.)
  4. Importance of CPRI link validation before turn-up
  5. Best practices in the industry for a complete BBU to RRH testing strategy
  6. Q&A